KPWC - Keeping Pace With Change

 Links:

1a Principal Designer Toolkit- CDM & BSA

1b. Introductory letter to the Coniac Principal Designer Toolkit CDM & Building Regulations

1c. PD Toolkit CDM 2015 -Design Risk Management (DRM) Tools 1-4

2. PD Toolkit CDM 2015 DRM Tool 7- Health Risks Matrix

3. Designer Risk Education 

3a. CDM 2015 Principal Designer Training Module

4. CDM2015 Delivering Projects - Case Studies & FAQ’s.(Was 2020 Vision)

5. Visual Standards on Site (Sub-group to develop)

6. Lower Thames Crossing-on hold for 2 years /Case Study only

7. Revocation & Reform Bill -“Consultation before Revocation” ROSPA

8. CONIAC Website at CIC How is this now working discussion?

9. Health and Safety File DRM/CDM 5

12a. Pre-Cosh CDM Research , Industry Learning & Simulator

12b. Design for Occupational Safety and Health (DfOSH) in Construction (Chapter 1 Summary)

14. PD Duties on a Domestic Project including Temporary Works

15. Client CDM Policy - Arrangements

17. Significant Risks & Dutyholder roles- CDM 2015

18. Project RR1198 PD Implementation Review

20. CIC “Designer” H&S Certification

21. Teamwork & Mutual Responsibility -CDM 2015

22a. Safe Working at Height (WAH)- HSE Hierarchy of WAH IRATA Paper 2025

22b. Safe Working at Height - HSE Hierarchy of WAH Explained

22c. IRATA / DIOHAS - Why use Rope Access?

23. Mythbusters Revisited- Proportionality in CDM Explained

24. DRM/CDM Brief & DRM/CDM Long Projects

25a. CONIAC reconstitution 2023

25b. CONIAC Future Strategy 2022-2032

26. Making Incident Information More Discoverable

27. What Good Looks Like in Design

28. Making Incident Information More Discoverable

29. The Principal Designer role and duties in practice 2026?

30. Modular Construction

31. Cross Communication & Engagmement Plan 2024

32. Perfluoroalkyl and Polyfluoroalkyl Substances (PFAS)

33. CDM Guidance - Proposed Changes:

a) Domestic Projects

b) All Other Projects

34.Heavy Component Movement Strategies

35. Mental Health & Wellbeing

36 Coniac Task & Finish Group- Post PIR for CDM 2015 Guidance enhancement

37. Common Assessment Standards

38 Coniac Mandate Format for Workstream Projects

39 F10 CDM 2015 Notification Draft Form

39. CDM 2015 Post Implementation Review 2026

39a. CDM 2015 PIR L153 Proposed Changes

39b. CDM 2015 L153 Guidance Review & Executive Summary